Canada mine filling method mining column

The International Nickel Company Frude Stoby Mine is a steeply inclined deposit with an ore body thickness of 30 m and unstable ore surrounding rock. Before 1961, the pillars were recovered by the box pillar filling method. The pillars were mostly deformed and very unsafe. The original mine is 9.3m wide and the pillar width is 5.7m. After that, the mine and the pillar width are changed to 5m. The pillar is replaced by cement tailings and is cemented to the mining method. See the figure below. Safety and economic effects have improved, and labor productivity of mining workers has increased by 50% to 100%.
Schematic diagram of the downward stratified filling method
1—return airway; 2—return well; 3—return wind communication roadway; 4—personal ventilation shaft;
5—slip mine; 6—loading mine roadway along the vein; 7—piercing ore loading roadway; 8—material transportation roadway;
9—Elevator shaft; 10—Second stage roadway; 11—Loading funnel

    ●    Used in hydraulic system.

    ●    Filter media is Complex Fiber, Resin-Impregnated Paper, Stainless Steel Sintered Metal Mesh, control cleanliness effective.

    ●    First bubble point per ISO2942.

    ●    Flow resistance per ISO3968.

    ●    Retained capacity and Filter efficiency per ISO16889.

    ●    Mass filtration precision for choose.

    ●    The size can make to order according to the customer's demand.

Gylw Series High Pressure Line Filter

Filter Element Types,Ryl620 High Temperature Filter Element,Ryl650 High Temperature Filter Element,High Temperature Filter Element

XINXIANG PINGYUAN AVIATION HYDRAULIC EQUIPMENTS CO.,LTD , https://www.pyefl.com