Yichang Shipyard "shipbuilding transformation" work started

In the afternoon of the day, Changhang Heavy Industry Yichang Shipyard held a mobilization meeting for “shipbuilding and transformation”, and nearly 100 people attended the conference. The convening of the conference marked the full launch of the “shipbuilding transformation” work of Changhang Heavy Industry Yichang Shipyard.
At the meeting, the director and chief engineer Zeng Xiaohu made a nearly two-hour mobilization report. He emphasized that “fine shipbuilding” work “fine management is the foundation, leadership attention is the key, technical design is the leader, production preparation is the soul”; It is required that the whole plant will not "arguing, not discussing, and not rigidizing" the "shipbuilding transformation" work, and will continue unswervingly in accordance with the "shipbuilding transformation model" work plan.
Under the support of Changhang Heavy Industry, Changhang Heavy Industry Yichang Shipyard's “shipbuilding transformation model” has been gradually implemented two years ago. According to the “decomposition and combination principle” of the system engineering, it has clearly produced seven major production processes and realized “intermediate products”. "Oriented grading manufacturing system. In accordance with the requirements of “ship-making transformation”, the tire frame was re-reformed, and the “planar tire frame clamping method” and “curved tire frame clamping method” hull structure manufacturing process (reported patent technology) were applied and controlled. The core technology of steel plate welding deformation.

Angular Contact Ball Bearing

Angular Contact Ball Bearing,Angular Contact Ball Bearing 7018A,Angular Contact Ball Bearing 7208

Thrust Ball bearing Co., Ltd. , http://www.cnrollerbearing.com